# **Compte rendu réunion DIRAC@IN2P3**
## Mardi 15 Septembre 2026
**Atendees**: Andrei, Axel, Bertrand, Héloïse, Loris, Luisa, Mazen, Natthan, Stella-Maria, Sorina, Vanessa
**Agenda**:

1. Project Status
2. Services, Projects
3. Conference, workshop, publications
4. Consortium
5. AOB
## **1. Project Status**
**1.1. Versions**
* DIRAC v8.0.83 (from 8.0.81)
Minor fixes
dirac-jobexec fix for using parameterised input data
* Still PR:
* outputPath, LFN globbing in the output data
* enabling File Monitoring for Transformations
* 9.0: propagation of 8.0 fixes
* DIRAC v9.1.18 (from 9.1.12)
* See release notes: https://github.com/DIRACGrid/DIRAC/blob/v9.1.18/release.notes
* Parameterized SQL calls to allow arguments checking by the MySQL client
* correct AccountingDB bucket writing (raw buckets were not dropped)
* Multiple optimizations, fixes (DMS, Accounting, etc)
* DIRACX Release v0.1.0 (from 0.0.14)
* v0.4.1 (from v0.1.0)
* added pilot db and routers
* rss router
* + multiple minor fixes
**1.2. Current Developments:**
* The last Ddev meeting https://indico.cern.ch/event/1721787/
* Sprints (Natthan, Luisa, Stella, Loris, Heloise, Mazen)
*
**1.2.1 IN2P3 contributions**
* DMS/File Catalog porting (Andrei, Heloise )
* We have to restart after the summer
* concentrate on 9.1 and back port things as necessary
* diracx-cwl (Ryan)
* FiTS (Heloise)
* Access with tokens/certificates
* Deployment with K8s (Bertrand)
* Opensearch global prefixes
* SeeweedFS
* Others
* Moving to DIRAC9/DiracX of the EGI service
* CTAO will most likely go in production by January 2027
* While keeping the DIRAC8 service in parallel
**1.3. Services**
**1.3.1. EGI**: The service itself is running smoothly
* Check-In Keycloak upgrade - changed token format (audience claim)
* requires changes in the DIRAC code and in the HTCondor sites configuration
* We have to see if it is compatible with IAM and changes can be generally accepted
**1.3.2. IN2P3**:
* Still only km3net.org configured, not heavily used
* mostly for the GreenDIGIT related studies
**1.3.3. FITS DIRAC service** (Heloise, Vanessa, Bertrand)
**1.4. European/National Projects**
**1.4.1. GreenDIGIT** (Mazen)
* Elsevier Paper
* Poster for the EGI Conference
**1.4.2. PEPR STEEL** (Andrei)
* Looking for prerequisites for opening recruitment
**1.4.3. ENSURE TECH-01 call** (Sorina):
* Kick-off meeting next week
* Presentation to be prepared
**1.4.4. MesoClouds RI proposal, Numpex**
* MesoCloud was enabled officially by the Ministry
**1.4.5. Numpex discussion**
* PEPR NUMPEX presentation at the JCAD
## **2. Projects**
**2.1. CTAO** (Luisa, Natthan)
* First data to be treated by the DPS (DIRAC) with CWL described
jobs but the current transformation system. Will need custom CTAO
plug-ins. This is to be made ready by the January 2027.
**2.2 Biomed** (Sorina, Axel)
* Reduced activity in summer, will pro
**2.3. Juno** (Andrei)
* Ongoing production without major upgrades and problems
* File monitoring is very desirable
**2.4 KM3NeT.org** (Vanessa)
## **3. Conference, workshop, publications**
* JCAD'26, Nantes, 5-7 October 2026
* DIRAC/GreenDIGIT poster
* EGI'26, Ghents, Sep 21-24 2026
* DIRAC/GreenDIGIT poster
* GreenDIGIT AHM
* ENSURE kick-off
* DIRAC User's Workshop, Prague, FZU, 13-16 October 2026
* Discussing with CTAO the next DUW venue (most likely LUPM,Montpellier)
## 4. Consortium
Discussing CTAO membership
## 5. AOB
The next meeting date: 22 Octobre 14pm