55 views
   owned this note
# **Compte rendu réunion DIRAC@IN2P3** ## Mardi 15 Septembre 2026 **Atendees**: Andrei, Axel, Bertrand, Héloïse, Loris, Luisa, Mazen, Natthan, Stella-Maria, Sorina, Vanessa **Agenda**: ![](https://) 1. Project Status 2. Services, Projects 3. Conference, workshop, publications 4. Consortium 5. AOB ## **1. Project Status** **1.1. Versions** * DIRAC v8.0.83 (from 8.0.81) Minor fixes dirac-jobexec fix for using parameterised input data * Still PR: * outputPath, LFN globbing in the output data * enabling File Monitoring for Transformations * 9.0: propagation of 8.0 fixes * DIRAC v9.1.18 (from 9.1.12) * See release notes: https://github.com/DIRACGrid/DIRAC/blob/v9.1.18/release.notes * Parameterized SQL calls to allow arguments checking by the MySQL client * correct AccountingDB bucket writing (raw buckets were not dropped) * Multiple optimizations, fixes (DMS, Accounting, etc) * DIRACX Release v0.1.0 (from 0.0.14) * v0.4.1 (from v0.1.0) * added pilot db and routers * rss router * + multiple minor fixes **1.2. Current Developments:** * The last Ddev meeting https://indico.cern.ch/event/1721787/ * Sprints (Natthan, Luisa, Stella, Loris, Heloise, Mazen) * **1.2.1 IN2P3 contributions** * DMS/File Catalog porting (Andrei, Heloise ) * We have to restart after the summer * concentrate on 9.1 and back port things as necessary * diracx-cwl (Ryan) * FiTS (Heloise) * Access with tokens/certificates * Deployment with K8s (Bertrand) * Opensearch global prefixes * SeeweedFS * Others * Moving to DIRAC9/DiracX of the EGI service * CTAO will most likely go in production by January 2027 * While keeping the DIRAC8 service in parallel **1.3. Services** **1.3.1. EGI**: The service itself is running smoothly * Check-In Keycloak upgrade - changed token format (audience claim) * requires changes in the DIRAC code and in the HTCondor sites configuration * We have to see if it is compatible with IAM and changes can be generally accepted **1.3.2. IN2P3**: * Still only km3net.org configured, not heavily used * mostly for the GreenDIGIT related studies **1.3.3. FITS DIRAC service** (Heloise, Vanessa, Bertrand) **1.4. European/National Projects** **1.4.1. GreenDIGIT** (Mazen) * Elsevier Paper * Poster for the EGI Conference **1.4.2. PEPR STEEL** (Andrei) * Looking for prerequisites for opening recruitment **1.4.3. ENSURE TECH-01 call** (Sorina): * Kick-off meeting next week * Presentation to be prepared **1.4.4. MesoClouds RI proposal, Numpex** * MesoCloud was enabled officially by the Ministry **1.4.5. Numpex discussion** * PEPR NUMPEX presentation at the JCAD ## **2. Projects** **2.1. CTAO** (Luisa, Natthan) * First data to be treated by the DPS (DIRAC) with CWL described jobs but the current transformation system. Will need custom CTAO plug-ins. This is to be made ready by the January 2027. **2.2 Biomed** (Sorina, Axel) * Reduced activity in summer, will pro **2.3. Juno** (Andrei) * Ongoing production without major upgrades and problems * File monitoring is very desirable **2.4 KM3NeT.org** (Vanessa) ## **3. Conference, workshop, publications** * JCAD'26, Nantes, 5-7 October 2026 * DIRAC/GreenDIGIT poster * EGI'26, Ghents, Sep 21-24 2026 * DIRAC/GreenDIGIT poster * GreenDIGIT AHM * ENSURE kick-off * DIRAC User's Workshop, Prague, FZU, 13-16 October 2026 * Discussing with CTAO the next DUW venue (most likely LUPM,Montpellier) ## 4. Consortium Discussing CTAO membership ## 5. AOB The next meeting date: 22 Octobre 14pm